The problem

Sheet 02 · Rev A

Most business data is never used. Not because it's missing.

Every system keeps its own records. Not one field connects them.

IDC · Rethink Data · 2020 · 1,500 respondents · pp. 5, 28

68%

32% used68% never used

of the data a business already holds is never used.

Manufacturing ranked lowest of all industries surveyed in data automation. The top barrier was not budget or security. It was making the data usable.

Already paid for

01

The machines that made the data are paid for, and the people who typed it in are on payroll.

02

The server that holds it is backed up every night.

The money is already spent. The data is already there.

Almost nobody sells the fix, so almost nobody buys it.

The records

Five files and five key fields. No join.

The ERP knows the job number. The machine logs cycle time and tool number. Inspection lives in the quality system, on scanned forms, and in v3-FINAL-use-this-one.xlsx.

erp_jobs.csvkey: job_nomachine_log_2024.txtkey: Jobquality_results.dbkey: JobNumberinspection_form.pdfkey: (none)v3-FINAL-use-this-one.xlsxkey: Job #5 FILES · 5 KEY NAMES · 0 SHARED
  • erp_jobs.csvkey: job_no
  • machine_log_2024.txtkey: Job
  • quality_results.dbkey: JobNumber
  • inspection_form.pdfkey: (none)
  • v3-FINAL-use-this-one.xlsxkey: Job #
  • 5 files · 5 key names · 0 shared

A Tuesday question

“Do we scrap more on this alloy, on machine four, on second shift, right after a tool change?”

You probably can't answer it.

You have all of it.

Every number is in the building, and no two files share a key.

Why the last tool didn't take
AutoML and no-code tools assume the data is already joined. They sell the last mile. Nobody builds the first ten.
  • 01The dashboard nobody opens.
  • 02The consultant's one model, one invoice.

Both started downstream of the problem.

Two clocks

Nothing dramatic happens. That's the trap.

Scrap is absorbed into margin, rework into hours, rush freight into the invoice. Each is small enough to swallow, so none is measured.

Clock 01 · The veteran

which machine drifts in Julywhich jobs never run at nightwhen the tool needs changing earlywhich supplier's lot runs hotwhat the notebook means58STORAGE LOCATION: HIS HEAD · BACKUP: NONE
  • · which machine drifts in July
  • · which jobs never run at night
  • · when the tool needs changing early
  • · which supplier's lot runs hot
  • · what the notebook means
  • Storage location: his head · backup: none

He knows which machine drifts in July. He is 58. None of it is written down.

Clock 02 · The history

Q1Q4Q7Q10Q12UNSTRUCTURED HISTORYMORE FORMATS · MORE VERSIONSPREDICTION RUNS ON HISTORY · START DATE MOVES THE FINISH DATE
Unstructured history · twelve quarters · more formats, more versionsPrediction runs on history · start date moves the finish date

Every unstructured quarter is a bigger cleanup later. Prediction runs on history, so starting late moves the finish.

The warning is usually already in your records.

Five buildings

The shop is one version. Run it through your building.

Manufacturing

The system
ERP or MES
The scrap
Scrap batch
The veteran
Floor lead

Contract manufacturing

The system
ERP, plus customer portals
The scrap
Late lot, rework
The veteran
Scheduler who knows which job slips

Dental / Medical

The system
Practice management
The scrap
No-show
The veteran
Front desk manager

Distribution

The system
WMS or ERP
The scrap
Dead SKU, stockout
The veteran
Buyer who reorders in October

Law

The system
Practice management
The scrap
Over-budget matter
The veteran
Partner who knows which case settles

Same three facts.

  1. 01The data exists.
  2. 02Nothing joins it.
  3. 03Decisions run without it.

Next

Start with the exploratory phase.

One dataset, one model trained on your history. $12,500, credited in full.